Dedicated air conditioning for a Hinckley server room.
Climetech installed a Fujitsu Airstage wall-mounted split system to provide cooling for a server room, with condensate managed by a pump and the system checked during commissioning.

Cooling for a room with equipment that needs a stable environment.
Server rooms contain equipment that produces heat while operating. This Hinckley business needed dedicated air conditioning for its server room, so Climetech installed a Fujitsu Airstage wall-mounted system.
Planned around the room and its drainage route.
The indoor unit was mounted high on the block wall. A condensate pump was fitted beneath it to remove condensate where a gravity-drain route was not practical. The pipework was contained neatly beside the unit.
System checks at handover.
After installation, the system was run and checked. During commissioning, the air leaving the indoor unit was measured at approximately 8°C. The finished installation provides the room with dedicated cooling for its server equipment.
Climetech Ltd installs and maintains commercial air conditioning across Leicestershire, Northamptonshire and Warwickshire. Every project is surveyed so the equipment, location and installation route can be considered before work begins.






Need cooling for a server or comms room?
Arrange a site survey to discuss the room, heat load, equipment position and practical installation options.